油烟净化器风管接驳处的防漏风措施

来源:http://www.jnqsg.com/     发布时间:2017-09-06  

  油烟由风机吸入静电油烟净化器,其中部分较大的油雾滴、油污颗粒在导流板上由于机械碰撞、阻留而被捕集。

  The fume is sucked into an electrostatic fume purifier by a fan, wherein, some larger oil droplets and oil particles are arrested on the deflector for mechanical collision and retention.

  当气流进入高压静电场时,在高压电场的作用下,油烟气体电离,油雾荷电,大部分得以降解炭化

  When the airflow enters the high voltage electrostatic field, the ionization of soot gas and the charge of fog are mostly degraded under the influence of high voltage electric field

  油烟净化器少部分微小油粒在吸附电场的电场力及气流作用下向电场的正负极板运动被收集在极板上并在自身重力的作用下流到集油盘,经排油通道排出,余下的微米级油雾被电场降解成二氧化碳和水,终排出洁净空气;同时在高压发生器的作用下,电场内空气产生臭氧,除去了烟气中大部分的气味。

  The role of a few small oil particles in electric field of electric field and flow to the adsorption of positive and negative plates moving electric field were collected at the plate and in the gravity down pan is discharged through the oil drain passage, micron oil mist remaining field degraded into carbon dioxide and water, eventually discharged clean air; at the same time in the high pressure generator under the action of air to generate ozone field, remove most of the smell of smoke.

  1.设备运行时受到振动将影响设备正常工作,所以设备和风机的风管连接时必须采用软连接;

  1. when the equipment is running, vibration will affect the normal operation of the equipment, so the connection between the equipment and the fan pipe must be a soft connection;

  2.为保证设备的净化效率,各风管的接驳处及法兰位需采取防漏风措施;

  2., in order to ensure the purification efficiency of the equipment, the air duct connection and flange position need to take anti leakage measures;
济南通风管道工程

  3.当多台设备并联使用,由统一的抽风机抽风的时候,也必须保证分配给各台设备处理风量的比例接近他们额定处理风量的比例。

  3., when multiple units are used in parallel, the ventilation rate should be guaranteed to be equal to the proportion of the rated air handling rate.

  4.为保证设备的净化效率,与设备出入风口连接的变径风管要尽量平顺夹角≤30度,变径风管前后必须安装长度比管径大2.5倍以上的直管;

  4. in order to ensure the purification efficiency of the equipment, to less than 30 degrees angle as smoothly as possible and reducing equipment and outlet pipe connected with the wind, reducing wind pipe must be installed before and after more than 2.5 times larger than the diameter of the length of the straight pipe;

  5.风机的出口好保留一段≥1.5D的直管,以减少风机的附加阻力;

  5. of the outlet of the fan is best kept straight for a period of not less than 1.5D, in order to reduce the additional resistance of fan;

  6.为保证设备的净化效率,设备应工作在负风压状态,即风机必须装在设备的后面,管道复杂时应在前面吸油烟罩加装引风机。

  6., in order to ensure the purification efficiency of the equipment, the equipment should work in the state of negative wind pressure, that is, fans must be installed in the back of the equipment. When the pipeline is complex, the fan shall be equipped with a draft fan in front of the hood.