您好,欢迎访问山东燊赫通风设备有限公司网站!

服务热线

13210558111

排烟罩设备安装前及安装中要了解什么

来源:http://www.jnqsg.com/     发布时间:2022-10-21  

大型酒店厨房内有很多的设备,每一种都是不可或缺的产品,尤其是排烟罩设备,它是重要的排烟产品,在应用方面可以发挥出很大的作用,那么大家知道济南排烟罩设备安装前及安装中要了解什么吗?
There are a lot of equipment in the kitchen of large hotels, each of which is an indispensable product, especially the smoke exhaust hood equipment, which is an important smoke exhaust product and can play a great role in application. Do you know what to know before and during the installation of the smoke exhaust hood equipment in Jinan?
排烟罩设备安装前:
Before installation of smoke exhaust hood:
在安装排烟罩设备之前,需要确保土建工程中的电气和管道管道预安装,以及地板和墙壁处理。门口的大小使设备能够顺利进入现场。当然根据方案预留足够的水位势,尤其是线径满足相应设备的要求。
Before installing the smoke exhaust hood equipment, it is necessary to ensure the pre installation of electrical and piping in the civil works, as well as the floor and wall treatment. The size of the doorway enables the equipment to enter the site smoothly. Of course, sufficient water level potential shall be reserved according to the scheme, especially the wire diameter to meet the requirements of corresponding equipment.
还有预留烟管孔的尺寸要符合设计要求。如果这些方面有些不符合初步设计的要求,经过沟通协调后才能安排设备进入现场安装。
The size of the reserved smoke pipe hole shall meet the design requirements. If some of these aspects do not meet the requirements of the preliminary design, the equipment can be arranged to enter the site for installation after communication and coordination.
在进入酒店厨房设备之前,需要检查功能空间的大小是否与酒店厨房工程图纸一致,并及时调整,然后安排设备进入并设置顺序。
Before entering the hotel kitchen equipment, it is necessary to check whether the size of the functional space is consistent with the hotel kitchen engineering drawings, adjust it in time, and then arrange the equipment to enter and set the order.
济南排烟罩
排烟罩设备安装中
Installation of smoke exhaust hood
注意设备的安装和施工顺序。先安装排风系统,然后是冷库,灯具设计,吊顶,门窗安装。然后老师可以有效的安装炉灶、电器、机械设备,然后在厨房安装排烟设备。所有安装工作完成后,酒店厨房设备调试程序将运行。如果顺序混乱,可能会影响一些设备的安装麻烦。
Pay attention to the equipment installation and construction sequence. First install the exhaust system, then the cold storage, lamp design, suspended ceiling, and door and window installation. Then teachers can effectively install stoves, electrical appliances and mechanical equipment, and then install smoke exhaust equipment in the kitchen. After all installation work is completed, the hotel kitchen equipment commissioning program will run. If the sequence is confused, it may affect the installation of some equipment.
各种设备需要按照自己的设计图纸和安装工程施工管理办法进行安装,如排烟罩设备——烟罩的安装面积,烟罩的安装高度,各种配件的安装时间顺序,烟罩的吊装坡度,安装后有什么设计要求,安装的企业技术标准有什么关系等,酒店厨房设备的各个方面都要充分考虑和处理。
All kinds of equipment shall be installed according to their own design drawings and installation project construction management methods, such as smoke exhaust hood equipment - installation area of smoke exhaust hood, installation height of smoke exhaust hood, installation time sequence of various accessories, lifting slope of smoke exhaust hood, what are the design requirements after installation, what is the relationship between the installed enterprise technical standards, etc. All aspects of hotel kitchen equipment shall be fully considered and handled.
上述内容已经为大家详细的总结完了,相信大家看完之后会对此有新的认识和了解,如若想要了解更多关于排烟罩方面的知识,可以多多关注我们的网站http://www.jnqsg.com,希望能够帮助到大家。
The above content has been summarized in detail for you. I believe you will have new understanding and understanding after reading it. If you want to know more about the exhaust hood, you can pay more attention to our website http://www.jnqsg.com I hope it can help you.

上一篇:厨房排烟系统如何进行标准的排烟?
下一篇:关于通风管道加工安装时的五个要点